Office Building

Vodafone Egypt Telecommunications - link

A Smart office building designed for telecommunications business use located in SMART VILLAGE, Cairo, Egypt.

Approximately 6,000 m 2 in total, 6 floors, 4 of which are above ground level for office use.

a multipurpose hall with other facilities located at the bottom of the building.
 
A kitchen and Cafeteria located at the roof.
 
Vodafone & data network telecommunication systems and Elevators were delivered and installed by a Specialized Subcontractor.

Amwal AL-Arabia Building

Amwal office building in SMART VILLAGES, Cairo, Egypt Designed to accommodate 300 Employee:

The project & built up area is approximately 7,000m 2 . It consists of 2 Basements each (1,500 m 2 ) for Car Parks and stores plus the ground floor (1,000 m 2 )and 3 typical floors for office use (each 1,000m 2 ).
 
The project includes conference hall, meeting rooms & cafeteria.

CIB's Branches

The CIB Bank commissioned EPM as the lead firm for providing Project Management Services (Program Manager) for all its branches Beside providing project management services for some other branches (15 branches).

The 15 branches of the CIB Bank which were assigned to EPM, were Spread out in the governorates of Cairo, Alexandria, and the Red Sea, the branch areas range between 150 m 2 to 6,000 m 2 .

A British Architectural design firm has been commissioned by the CIB Bank to develop the design concept,

standardizing special features and specifications to form a recognizable character for the facades of the Bank branches.

TAGI office buildings Project in smart village

TAGI Smart office building in SMART VILLAGE, Cairo, Egypt built to accommodate 300 Employees:

The project & area is approximately 7,000m 2 .

It consist of 2 Basements each (1,500 m 2 ) for car parks and stores plus the ground floor and 3 typical floors for office use (1,000m2 each).

The project includes a conference hall, meeting rooms & a cafeteria.

TAGI office buildings Project in Lebnan

Smart office building in Central Beirut.
The project 's plot area is 500 m 2 (Ground + 8 Floors).
The project consist of 2 Basements 440 m 2 /each.
The project 's total area is approximately 2,345 m 2 .

Aqaba Business park

A Business Park of 10 Typical Smart office Buildings to be built over 21,000 m 2 piece of land at "AQABASPECIAL ECONOMIC ZONE" in JORDAN.
The basement consists of 2 floors built on the total land area (21,000m 2 ) to accommodate car parks and the central E& M machinery.
The utilities and infrastructures for the project are centrally serving the different buildings with localized control
for each individual building.

TAGI Office Buildings project in Syria

Smart office building in Suburban SYRIA.

The project is approximately ≃1200 m 2 .

It consists of one Basement 312 m 2 for Car Parking, Ground floor and 3 typical floors for office use.

DANA Tower Project in Qatar

The project is composed of Two basement floors for parking and electro-mechanical services,

the area of each basement = 5,300 m 2 .

The above ground office areas consist of ground floor plus 27 typical floors with a total floor

area of 28,750 m 2 .

The Contractual duration of the project is 20 months, but the actual duration of the project

exceeded double it's duration . The project suffered excessive delays, mainly due to contractor's reasons.

The Client requested our services to investigate the problems.

Vodafone Egypt Telecommunications - c2 builing

Due to the rapid increase of work volume of VODAFONE Egypt (SAE) and consequently the numbers of the employed staff, VODAFONE rented an office building (C2) from SMART VILLAGES Company to accommodate its staff. The building was under construction by SV.

The building area is approximately 22000m 2 , 4 floors above ground for office use (each 4,000 m 2 )and two basements for car parking.

Vodafone selected to execute the data and telecommunication networks by itself and to employ a separate contractor for the finishing's work of the main entrance and the lobby located at each floor.

CMIF Building

CMIF Smart office building in SMART VILLAGES, made to accommodate multi tenan (core and shell finishing concept).

The project's total area is approximately 14,000m 2 . It consist of Two Basements for car parking and stores plus the ground floor and 3 typical floors for office use. (for rent , sale or leasing)

The project includes a conference hall, meeting rooms, a cafeteria & a gymnasium.

Raya Holding Headquarter

RAYA Headquarters is a Smart office building in Six of October City:

The Building is approximately 22,000 m 2 , it consists of two Basements for car parking and stores plus 10 typical floors for office use to accommodate 1,500 employees, it includes a conference hall, meeting rooms, a cafeteria & a gymnasium.

The RC skeleton was already finished, the Architectural Interior and Exterior Design needed a complete redesign in addition to the design of electro-mechanical system'  to accommodate RAYA'S new requirements and organizational structure.

Talal Abou Ghazaleh Building Office in Riyadh

Head office building at RIYADH-KSA:

The Building built up area is approximately 7,000 m 2 , it consists of Two Basements for car parks and stores, Ground floor plus 6 typical floors for office use to accommodate 500 employees, the project also includes a conference hall, meeting rooms & cafeteria.

The R.C skeleton was already finished, the Architectural Interior and Exterior Design needed a complete redesign toaccommodate TAGI's new requirements and organizational structure.

Talal Abou Ghazaleh Building Office in Bahrain

Smart office building built to accommodate 200 Employees.

The project is approximately 7,000 m 2 .

It consist of 3 floors above ground level for car parks with a total area 1,500 m 2 plus the ground floor and 7 typical floors for office use 500 m 2 each.

The project includes a conference hall, training halls, meeting

rooms & a cafeteria.